Sign In
We'll never share your email with anyone else.
Reset Password

Enter your email address and we'll send you a link to reset your password.

Back to Sign In
AVAILABLE FORMATS

Watch Now Download
Poster Studio 60 on the Sunset Strip

Studio 60 on the Sunset Strip Season 1 Episode 5: The Long Lead Story 2006

Watch Tv Show Series Studio 60 on the Sunset Strip : During cast rehearsals with Lauren Graham and Sting, a reporter attempts to get the real story on Matt and Harriet. Meanwhile Jordan passes on a tasteless new reality series..

Genre: Comedy, Drama
Air Date: 2006-10-16
Season Number: 1
Episodes Number: 5
Stars: Matthew Perry (Matt Albie) , Amanda Peet (Jordan McDeere) , Bradley Whitford (Danny Tripp) , Steven Weber (Jack Rudolph) , D.L. Hughley (Simon Stiles) , Sarah Paulson (Harriet Hayes) , Nate Corddry (Tom Jeter) , Timothy Busfield (Cal Shanley)
Download : MKV
Download : MP4

TV Similars

TV Recommendations